Photograph From the Same Spots Every Visit: The Visits
Draw photos from different angles are hard to compare. Did the wall move or did the photographer? Marking a few spots in each room and photographing from them every visit makes progress easy to see. Setup takes about twenty minutes. The question is how many visits it takes to pay back.
The steps
- Price the setup: minutes × the value of your time.
- Price the saving per visit: minutes saved × the value of your time.
- Break-even visits = setup cost ÷ saving per visit.
- Pair it with baseline photos (baseline photos at closing).
A worked example
Example (illustrative arithmetic, not benchmarks)
Setup takes 20 minutes at $60 an hour: $20. Each visit saves 5 minutes of comparing: $5. Every figure is a made-up round number.
| Visits with same-spot photos | Time saved (visits × $5) | Saved − $20 |
|---|---|---|
| 2 | $10 | −$10 |
| 4 | $20 | $0 (break-even) |
| 8 | $40 | +$20 |
| 16 | $80 | +$60 |
The spots pay back after 4 visits: $20 ÷ $5. A rehab with one draw inspection every two weeks is there in two months.
Pick one or two spots per room and one for the exterior, mark them with painter’s tape or a note, and have the inspector or borrower use them every time. Same-spot photos show progress, not quality, so keep the inspection too.
Making it routine
- Pick one or two spots per room.
- Mark them on a simple floor plan.
- Use them at every visit.
- Keep the inspection for quality.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how progress between draws changes the funds still held.