How Many Draw Photos? Review Time vs Missed Problems

By DeskTech HQ · · 2 min read

A draw request with five photos is quick to review. One with fifteen takes three times as long. The extra photos may show a problem the first five did not. The question is how often that has to happen to be worth the minutes.

The steps

  1. Time the review of one photo.
  2. Compute the extra review time of the longer list and its cost.
  3. Estimate the value of a problem the longer list could show: an overpayment avoided or a defect caught.
  4. Divide the extra cost by that value. That is the break-even chance.
  5. Compare it with how often photos have shown problems in your draws (lender site visit report).

A worked example

Example (illustrative arithmetic, not benchmarks)

Reviewing a photo takes about a minute. Five photos take 5 minutes; fifteen take 15. The extra is 10 minutes, or $10 at $60 an hour. A problem the extra photos would show is worth about $2,000, such as an overpayment on work not done. You review 150 draws a year. Every figure is a made-up round number.

Chance the extra photos show a problem Expected value (× $2,000) Extra review cost Net per draw
0.2% $4 $10 −$6
0.5% $10 $10 $0
2% $40 $10 +$30
Break-even $10 ÷ $2,000 = 0.5%

If one draw in two hundred has a problem that the extra ten photos would reveal and the first five would not, the longer list pays. That is a low bar. Across 150 draws the extra review time costs $1,500 a year, which is small next to even one overpayment.

How you ask for photos matters more than how many. A short, specific list (“each room with new drywall, the roof from two sides, the electrical panel”) beats a fixed number. Ask for dated photos and a note of what each shows, so the review is quick. For large draws or a doubtful borrower, photos are not enough: send someone (draw inspections).

Making it routine

  1. Give borrowers a specific photo list for each kind of draw.
  2. Time your review and track what photos caught.
  3. Raise the list for large draws.
  4. Inspect in person when photos raise a question.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the size of draws a holdback creates.

Quick answers

How many photos should a draw request include?

Enough to show each area of work being paid for. The right number depends on the project and the draw.

What does a longer list cost?

Review time for you and preparation time for the borrower.

How do I decide?

Divide the extra review time's cost by the value of the problem a longer list could show. The result is the chance of such a problem at which the longer list pays.

Do photos replace an inspection?

No. Photos show what the borrower chooses to show. For large draws, an independent look is safer.

Do the numbers in this guide apply to my draws?

No. The times, rates and values are made up for the example. They are not benchmarks.