Protecting Collateral After Default: What Preservation Costs

By DeskTech HQ · · 2 min read

The borrower has stopped paying and the house is empty. Foreclosure will take months. In the meantime the property needs heat or drained pipes, a working lock and a current insurance policy. The question is how much to spend before the sale.

The steps

  1. Confirm with an attorney what the documents and the law let you do and when (workout options).
  2. List the preservation items and their monthly or one-time costs.
  3. Group them into essentials and extras.
  4. Estimate the damage a neglected property could suffer and how each level changes the odds.
  5. Compare the total cost of each level: spending plus expected damage.

A worked example

Example (illustrative arithmetic, not market data)

Six months to resolve, in cold weather. One-time: winterization $450 and a lock change $150. Monthly: lawn and snow care $120, utilities to prevent freezing $200, inspections $60 and a vacant-property insurance policy $325. A burst pipe or similar loss would cost $15,000. Assumed odds of such a loss over six months: 40% with no preservation, 15% with essentials, 8% with the full program. Every figure is a made-up round number.

Level What it includes Cost over 6 months Expected damage Total
None $0 40% × $15,000 = $6,000 $6,000
Essentials Winterization, lock, insurance $2,550 15% × $15,000 = $2,250 $4,800
Full Essentials + lawn, utilities, inspections $4,830 8% × $15,000 = $1,200 $6,030

The essentials cost $2,550 ($450 + $150 + 6 × $325) and bring the total down by $1,200. The full program adds $2,280 of extras to save only $1,050 more of expected damage, so it ends up costing more than the essentials. Doing nothing is not free: insurers may also deny a claim on an unsecured vacant property, which this arithmetic leaves out (vacant property insurance).

The odds are guesses, and a burst pipe in a mild month is a different story. The point is to compare levels in dollars, not to trust one figure. Advances you make are usually added to what the borrower owes, but they are repaid only if the sale produces enough, so they raise the amount at risk (bankruptcy delay).

Making it routine

  1. Have a written preservation checklist and a vendor list before you need them.
  2. Keep taxes and insurance current (taxes and escrow).
  3. Photograph the property at each visit (site visit report).
  4. Keep a log of every cost advanced, with receipts.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the loan amount that the property has to protect.

Quick answers

What is property preservation?

Steps taken to keep a property safe and in condition while a default is resolved: securing it, protecting it from weather, keeping insurance and utilities in place, and inspecting it.

Can a lender enter and do this work?

Only to the extent the loan documents and the law allow, and that can depend on whether the property is occupied and on the stage of the default. Ask an attorney before anyone enters, changes locks or removes anything.

Who pays for preservation?

Often the lender advances the cost and adds it to the amount owed under the loan documents. Whether it is recoverable depends on the documents and on what a sale produces.

How do I choose how much to do?

Compare the cost of each level with the damage it might prevent. The essentials usually do most of the work, and a full program adds cost with a smaller extra benefit.

Do the numbers in this guide apply to my property?

No. The costs, damage and odds are made up for the example. They are not market data or advice about any property.

Keep reading

Private and hard money lending

When Borrower Insurance Lapses: Lender-Paid Coverage

Learn how to weigh the cost of buying coverage after a borrower's policy lapses against the loss you would face if the property is damaged uninsured.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.