Insuring a Flip: Vacant Property and Rehab Coverage Basics

By DeskTech HQ · · 2 min read

A flip is a house nobody lives in, full of tools, open walls and sometimes open pipes. That is exactly the kind of house where a loss can happen and where ordinary home insurance may not respond. Checking before you close costs a phone call.

What to ask

  1. Does the policy cover a vacant property, and for how long?
  2. Does it cover a property under renovation, and what work is excluded?
  3. Which events are covered: fire, water, vandalism, theft of materials?
  4. What are the coverage limit and the deductible?
  5. How long does the policy run, and what does an extension cost?
  6. Who needs to be named, such as a lender (lender insurance requirements)?

A worked example

Example (illustrative arithmetic, not a quote)

A six-month policy for a flip costs $1,850, a deductible of $2,500, and the project is expected to need an extension. Every figure is a made-up round number.

Item Calculation Amount
Premium per month $1,850 ÷ 6 $308
Two-month extension (same rate) 2 × $308 $617
Share of a $1,300 monthly holding cost $308 ÷ $1,300 23.7%

Suppose a burst pipe causes $18,000 of damage.

Item With coverage Without coverage
Premium paid $1,850 $0
Deductible $2,500 n/a
Loss paid by the owner $0 beyond the deductible $18,000
Total out of pocket $4,350 $18,000

The premium is 10.3% of the loss. Coverage saves $13,650 in this one case and costs $1,850 in every case. A loss is less likely than not, so the decision is about whether you can absorb it (cash reserve). Whether the policy would actually pay depends on its terms.

Keeping it simple

  1. Add the premium and any extension to the holding cost plan (holding costs).
  2. Get quotes before closing, not after.
  3. Keep the policy in force until the sale closes.
  4. Tell the insurer about major scope changes (scope of work).

Run your own numbers

Use the free holding cost calculator below to add insurance to your monthly cost and see what a longer project adds.

Quick answers

Why might standard home insurance not fit a flip?

Many standard policies limit or exclude coverage when a property is vacant or under major renovation. A flip is often both, so the policy type matters. An insurance agent can say what applies.

What should I ask an agent?

Whether vacancy or renovation limits coverage, which events are covered, the deductible, the coverage limit, how long the policy runs, whether it can be extended, and who must be listed on it, such as a lender.

Is the premium a holding cost?

Yes. It belongs in the holding cost estimate along with interest, taxes and utilities, and it grows if the project runs long and the policy has to be extended.

How do I decide if the coverage is worth it?

Compare the premium and deductible with the size of a plausible loss and with what you could absorb. A lender may also require coverage whatever the math says.

Do the numbers in this guide apply to my property?

No. The premium, deductible and loss are made up for the example. They are not quotes, market data or advice about what coverage to buy.

Keep reading

Flip project management

Visiting a Vacant Flip: Once a Week or Twice?

Learn how to weigh the time of an extra weekly visit to a vacant flip against the days sooner it would catch a leak or break-in, and the odds it pays.

· 2 min read
Flip project management

Winterizing a Vacant Flip: Cost vs a Burst Pipe

Learn how to compare the cost of winterizing a vacant flip with the cost of freeze damage, and how likely damage must be for winterizing to pay for itself.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.