Punch List: Hourly Handyman or Flat Bid?

By DeskTech HQ · · 1 min read

The last items on a rehab, the punch list, are small and many. A handyman can charge by the hour or give a flat price for the list. The break-even is the number of hours at which they cost the same.

The steps

  1. Get the hourly rate and the flat bid for the same written list.
  2. Break-even hours = flat bid ÷ hourly rate.
  3. Estimate how many hours the list will really take (the punch list question).

A worked example

Example (illustrative arithmetic, not quotes)

The handyman charges $55 an hour. The flat bid for the list is $1,200. Every figure is a made-up round number.

Hours the list takes Hourly cost (hours × $55) Flat bid − hourly
12 $660 +$540 (hourly cheaper)
21.8 $1,200 $0 (break-even)
30 $1,650 −$450 (flat cheaper)

The flat bid is cheaper once the list takes more than about twenty-two hours: $1,200 ÷ $55. A short list favors hourly. A long one favors flat.

The flat bid also protects you if the work runs over. But it only works with a written list. A vague list invites change orders, and the saving goes. An hourly job needs a cap, and a way to check hours worked (comparing contractor bids).

Making it routine

  1. Write the punch list with locations and items.
  2. Ask for both prices on the same list.
  3. Compute the break-even hours.
  4. Put a cap on hourly work.

Run your own numbers

Use the free holding cost calculator below to see what each day of delay on the last items costs.

Quick answers

What is the break-even?

The flat bid divided by the hourly rate.

Which is better when the list is long?

A flat bid, if the scope is fixed, because it caps your cost.

What is the risk of hourly?

Hours can run past the estimate.

What is the risk of flat?

A vague scope leads to extra charges. Write the list down.

Do the numbers in this guide apply to my project?

No. The rate and bid are made up for the example. They are not quotes.

Keep reading

Flip project management

List Now or Finish First? The Punch List Question

Learn how to compare the holding cost of finishing the punch list before listing with the price risk of showing an unfinished flip, and the break-even.

· 2 min read
Flip project management

Pre-Inspection Dry Run vs a Failed Inspection

Learn how to weigh an hour spent walking the job before a final inspection against the re-inspection fee and delay of a failure, and when it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.