Tag Every Water Shutoff With What It Controls
A joint lets go during a rehab and the crew spends ten minutes turning the wrong valves while water runs. Tags that say what each valve controls take six minutes to place. The question is how likely a leak with the wrong valve closed is for the tags to pay.
The steps
- Price the tags: tags + minutes × the value of your time.
- Price the extra damage while the right valve is found.
- Break-even chance = tags cost ÷ extra damage.
- Photograph them too (photograph the shutoffs at the first draw).
A worked example
Example (illustrative arithmetic, not predictions)
The tags cost $6 plus 6 minutes at $60 an hour ($6): $12. The extra damage from a slow shutoff costs $240. Every figure is a made-up round number.
| Chance of a leak with a slow shutoff | Expected cost avoided (chance × $240) | Avoided − $12 |
|---|---|---|
| 2.5% | $6 | −$6 |
| 5% | $12 | $0 (break-even) |
| 10% | $24 | +$12 |
| 15% | $36 | +$24 |
The tags pay at a 5% chance of a leak with a slow shutoff: $12 ÷ $240. During a rehab with new plumbing, that is plausible.
Tag the main and each branch with what it controls, test that each valve turns, and tell the crew where the main is. Replace any valve that seizes.
Making it routine
- Tag the main and each branch.
- Test that each valve turns.
- Tell the crew where the main is.
- Replace any valve that seizes.