Re-Add the Draw Request Totals: The Error Odds

By DeskTech HQ · · 1 min read

A draw request lists lines and a total. A column that does not add up can be an honest slip or a padded request. Re-adding takes three minutes with a calculator. The question is how likely the total is wrong for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Estimate the cost of an arithmetic error left in a paid draw.
  3. Break-even chance = cost ÷ error cost.
  4. Compare with how often totals were wrong in past draws (draw request review checklist).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 3 minutes at $60 an hour: $3. An error left in a paid draw would cost $150. Every figure is a made-up round number.

Chance a request has an arithmetic error Expected cost avoided (chance × $150) Avoided − $3
1% $1.50 −$1.50
2% $3.00 $0 (break-even)
5% $7.50 +$4.50
10% $15.00 +$12.00

The check pays at a 2% chance of an error in a request: $3 ÷ $150. Hand-built requests with many lines often exceed that.

Re-add every column, check the carried-forward balance against the last approved draw, and confirm the percent complete matches the dollars. An error in the borrower’s favor and one in yours are both worth a note to the contractor (a better draw request form).

Making it routine

  1. Re-add each column of the request.
  2. Check the balance carried from the last draw.
  3. Compare percent complete to dollars.
  4. Note any difference before approving.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how an overpaid draw changes the funds left for the rest of a rehab.

Quick answers

What does re-adding catch?

Totals that do not match the line items, in either direction.

How do I price it?

The minutes times the value of your time.

What does an error cost?

Overpayment, or a correction later.

What is the break-even chance?

The check's cost divided by the error's cost.

Do the numbers in this guide apply to my draws?

No. The time, cost and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.