Record a Backup Contact for the Contractor: The Odds
The contractor’s phone goes to voicemail the day the inspector arrives. With a second contact on file, a call to the office solves it. Recording one takes two minutes at the first draw. The question is how likely the contractor is to be unreachable for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price the chasing: minutes to track down a contractor × the value of your time.
- Break-even chance = step cost ÷ chasing cost.
- Record it with the contractor’s details (w-9 before the first draw).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 2 minutes at $60 an hour: $2. Chasing an unreachable contractor takes 40 minutes: $40. Every figure is a made-up round number.
| Chance the contractor is unreachable at a key moment | Expected chasing cost avoided (chance × $40) | Avoided − $2 |
|---|---|---|
| 2.5% | $1 | −$1 |
| 5% | $2 | $0 (break-even) |
| 10% | $4 | +$2 |
| 20% | $8 | +$6 |
The step pays at a 5% chance of an unreachable contractor: $2 ÷ $40. Contractors are on site, on ladders and in other jobs; one in ten unanswered calls is ordinary.
Ask for a second number and a second person, such as an office manager, and record them with the first. Use the backup for scheduling and information, not for approvals or payments, which belong to the person who signed the contract.
Making it routine
- Ask for a second number and person at the first draw.
- Record them with the first contact.
- Use them for scheduling and information only.
- Keep the data secure.