Photograph the Shutoffs at the First Draw: The Odds

By DeskTech HQ · · 1 min read

A rehab with the walls open is exposed to a burst pipe or a power fault. If no one knows where the shutoffs are, minutes turn into thousands of dollars. Asking for photos at the first draw takes five minutes. The question is how likely an emergency is for the step to pay.

The steps

  1. Price the step: minutes × the value of your time.
  2. Estimate the extra damage from a slow shutoff: water, drying, delay.
  3. Break-even chance = cost ÷ extra damage.
  4. Compare with the age of the plumbing in the project (pressure testing before the drywall).

A worked example

Example (illustrative arithmetic, not predictions)

The step takes 5 minutes at $60 an hour: $5. A slow shutoff would add $1,000 of damage. Every figure is a made-up round number.

Chance of an emergency where the shutoff is unknown Expected damage avoided (chance × $1,000) Avoided − $5
0.25% $2.50 −$2.50
0.5% $5.00 $0 (break-even)
2% $20.00 +$15.00
5% $50.00 +$45.00

The step pays at a 0.5% chance of an emergency: $5 ÷ $1,000. Old plumbing and a long project make that likely.

Ask for a photo of the main water shutoff, the electric panel and the gas shutoff, with a note of where each is. File them with the draw record and share them with the contractor. The owner and contractor stay responsible for site safety.

Making it routine

  1. Ask for the photos before the first draw.
  2. Include the water, power and gas shutoffs.
  3. File them with the draw record.
  4. Share them with the contractor.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how an emergency delay changes the interest on a rehab loan.

Quick answers

Why photograph the shutoffs?

In a burst pipe or fire, finding the shutoff fast limits damage.

How do I price it?

The minutes to ask and file the photos.

What is the break-even chance?

The cost divided by the extra damage avoided.

Who needs the photos?

You, the contractor and any emergency responder.

Do the numbers in this guide apply to my rehab?

No. The cost, damage and odds are made up for the example. They are not predictions.