Photo of the Posted Permit at the First Draw: The Odds
Rehab work often needs a permit that must be posted on site. A rehab started without one can be stopped, fined and held up. Asking for a photo of the posted permit at the first draw takes three minutes. The question is how likely an unpermitted start is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Estimate the cost of an unpermitted start: fines, a stop-work order, delay.
- Break-even chance = cost ÷ unpermitted start cost.
- Compare with your local permit practice (code violations and open permits).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 3 minutes at $60 an hour: $3. An unpermitted start would cost $600. Every figure is a made-up round number.
| Chance of an unpermitted start | Expected cost avoided (chance × $600) | Avoided − $3 |
|---|---|---|
| 0.25% | $1.50 | −$1.50 |
| 0.5% | $3.00 | $0 (break-even) |
| 2% | $12.00 | +$9.00 |
| 5% | $30.00 | +$27.00 |
The step pays at a 0.5% chance of an unpermitted start: $3 ÷ $600. That is a very low bar.
A photo shows that a permit was posted, with a number and a date. It does not show that the work was inspected or passed, so keep the permit number on file and check it with the building department when the work is large (permit expediter fee vs days saved).
Making it routine
- Ask for the permit photo before the first draw.
- Record the permit number and date.
- Check large projects with the building department.
- Track inspections through the final draw.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how a stop-work delay adds interest to a rehab loan.