Rent a Dehumidifier While Drywall Dries: Days to Pay

By DeskTech HQ · · 1 min read

Joint compound and paint dry slowly in a damp house. The crew waits and the days add up. A rented dehumidifier costs money, but a day of waiting costs holding cost. The question is how many days it must save to pay for the rental.

The steps

  1. Price the rental for the period you need it.
  2. Price a day of delay: the holding cost per day.
  3. Break-even days = rental ÷ holding cost per day.
  4. Compare with waiting (drying time before flooring).

A worked example

Example (illustrative arithmetic, not predictions)

The rental costs $40 for the week. A day of delay costs $20 in holding cost. Every figure is a made-up round number.

Days saved Holding cost avoided (days × $20) Avoided − $40
1 $20 −$20
2 $40 $0 (break-even)
3 $60 +$20
5 $100 +$60

The rental pays if it saves 2 days: $40 ÷ $20. In a damp climate or a wet season, that is plausible.

Place the unit in the middle of the room with the windows closed, empty the tank or use a drain hose, and check that it does not overload the circuit. If the air stays damp, look for a leak.

Making it routine

  1. Close the windows.
  2. Drain the tank or use a hose.
  3. Do not overload the circuit.
  4. Look for a leak if the air stays damp.

Run your own numbers

Use the free holding cost calculator below to see what a day of delay costs on your own flip.

Quick answers

What does a dehumidifier do?

It pulls moisture from the air so wet material dries faster.

How do I price it?

The rental for the period you need it.

What does a day of delay cost?

The holding cost for one more day.

What is the break-even?

The rental divided by the holding cost per day.

Do the numbers in this guide apply to my flip?

No. The rental and savings are made up for the example. They are not predictions.

Keep reading

Flip project management

Permit Expediter Fee vs Days Saved

Learn how to find the number of days a permit expediter must save before the fee is covered by the holding cost you would otherwise pay while waiting.

· 2 min read