Doing the Work Yourself: What Your Hours Really Save

By DeskTech HQ · · 2 min read

A painter quotes $3,600. The paint costs $700. Doing it yourself saves $2,900, and a Saturday or two is a small price. Then the second Saturday becomes a third, and the flooring job is still waiting.

The steps

  1. For each task, get a contractor price and list your own materials and tool costs (comparing bids).
  2. Estimate your hours and how many extra weeks the job takes compared with a crew (schedule).
  3. Price the extra weeks at your weekly holding cost.
  4. Add an allowance for redoing part of the work.
  5. Divide the net saving by your hours, and compare it with what your hour is worth elsewhere (profit per hour).

A worked example

Example (illustrative arithmetic, not market data)

Weekly holding cost is $300. Two jobs. Painting: contractor $3,600, your materials $700, 60 hours, one extra week. Flooring: contractor $5,200, your materials and tool rental $2,100, 70 hours, two extra weeks, and a 15% chance you redo the materials ($315 expected). Every figure is a made-up round number.

Item Painting Flooring
Contractor price − your materials $2,900 $3,100
Extra weeks × $300 −$300 −$600
Redo allowance (15% × $2,100) −$315
Net saving $2,600 $2,185
Your hours 60 70
Net saving per hour $43.33 $31.21

Together, the two jobs save $4,785 for 130 hours, or $36.81 an hour. That saving is real. But if an hour spent finding or negotiating the next deal is worth $80 to you, the 130 hours cost more than they save (cost overrun decisions).

The painting is the better DIY job: more saving per hour, less delay, little risk of a costly mistake. The flooring is closer to the line, and a missed schedule or a bad cut moves it across (schedule buffer).

Making it routine

  1. Do this sum for each task, not for the whole rehab.
  2. Keep DIY to work that is safe, unlicensed and low-risk to redo.
  3. Put your own deadline in writing, since an open-ended job costs the most.
  4. Record your actual hours and compare them with the estimate.

Run your own numbers

Use the free holding cost calculator below to price the extra weeks that a do-it-yourself job adds.

Quick answers

Is doing the work myself always cheaper?

Not always. The saving is the contractor's price minus your materials, but your hours, the extra time the job takes and the cost of mistakes come out of it.

How do I value my own time?

Compare it with what an hour would earn elsewhere in your business, such as finding or negotiating the next deal. If that is higher than your net saving per hour, hiring is the better use of you.

What work should I never do myself?

Work that requires a license, a permit or special training, such as electrical, gas, structural or some plumbing and roofing, may be restricted where you are, and mistakes can be dangerous. Ask the building department and your insurer.

How should I treat the extra time?

As holding cost. Every extra week the property sits unfinished costs interest, taxes, insurance and utilities ([holding costs](/blog/holding-costs-on-a-flip)).

Do the numbers in this guide apply to my project?

No. The prices, hours, delay and redo rate are made up for the example. They are not market data or advice about any job.

Keep reading

Flip project management

List Now or Finish First? The Punch List Question

Learn how to compare the holding cost of finishing the punch list before listing with the price risk of showing an unfinished flip, and the break-even.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.