Replace Yellowed Switch and Outlet Plates: The Days
Yellowed switch plates and cracked outlet covers are small things that show up in every listing photo. Replacing ten of them costs a few dollars and a few minutes. The question is how many vacancy days faster the unit must lease for the work to pay.
The steps
- Price the work: the plates plus minutes to fit them.
- Daily rent = monthly rent ÷ 30.
- Break-even days = work cost ÷ daily rent.
- Compare with the days your units sit empty (professional rental photos).
A worked example
Example (illustrative arithmetic, not quotes or benchmarks)
Ten plates and the time to fit them cost $15. Daily rent is $50. Every figure is a made-up round number.
| Days faster to lease | Rent gained (days × $50) | Gained − $15 |
|---|---|---|
| 0.1 | $5 | −$10 |
| 0.3 | $15 | $0 (break-even) |
| 1 | $50 | +$35 |
| 2 | $100 | +$85 |
The work pays if it leases the unit 0.3 days faster: $15 ÷ $50. A cleaner look in photos and showings could plausibly do that.
Use plain white plates, switch off the breaker if you are unsure, and never remove anything but the cover. If a switch or outlet is loose, scorched or warm, stop and call an electrician (replacing worn outlets at turnover).
Making it routine
- Check every plate at turnover.
- Replace yellowed or cracked ones.
- Turn off power if you are unsure.
- Call an electrician for anything behind the plate.
Run your own numbers
Use the free BRRRR calculator below to see how a few days of vacancy change a rental’s yearly cash flow.