Check Door Strike Plates and Latches at Turnover: The Odds

By DeskTech HQ · · 1 min read

A door that will not latch, or that is held shut by half-inch screws in a soft frame, is a call and a security risk. Tightening the strike plate and using long screws takes a few minutes at turnover. The question is how likely a door call or break-in is for the job to pay.

The steps

  1. Price the job: the screws and plate plus the minutes.
  2. Price a security or door call: the call, the repair and goodwill.
  3. Break-even chance = job cost ÷ call cost.
  4. Pair it with rekeying (keyless locks vs rekeying at turnover).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The job costs $4 with time. A security or door call would cost $100. Every figure is a made-up round number.

Chance of a door or security call Expected call cost avoided (chance × $100) Avoided − $4
2% $2 −$2
4% $4 $0 (break-even)
8% $8 +$4
15% $15 +$11

The job pays at a 4% chance of a call: $4 ÷ $100. On older doors with worn frames, the chance is higher.

Close each door and check that the latch and the deadbolt catch cleanly. Replace short strike-plate screws with 3-inch screws that reach the framing, and adjust or replace plates that do not line up. Report any damaged frame for repair.

Making it routine

  1. Close each door and test the latch and deadbolt.
  2. Fit 3-inch screws in the strike plates.
  3. Adjust or replace misaligned plates.
  4. Report damaged frames for repair.

Run your own numbers

Use the free BRRRR calculator below to see how a small yearly cost per unit adds up across a building.

Quick answers

What is a strike plate?

The metal plate in the frame that the latch or deadbolt goes into.

Why check it?

Loose or short screws let a door be forced and make latches rattle or fail to catch.

How do I price the job?

The screws and plate plus the minutes.

What is the break-even chance?

The cost divided by the cost of a security or door call.

Do the numbers in this guide apply to my rental?

No. The cost and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.