Clean or Replace Faucet Aerators at Turnover: The Odds
A clogged aerator makes a sink dribble and brings a call about low pressure. Unscrewing the tip, rinsing the screen or fitting a new one takes a minute and costs a couple of dollars. The question is how likely a call is for the work to pay.
The steps
- Price the work: the part or cleaner plus minutes.
- Price a low-pressure call: the call, the trip and goodwill.
- Break-even chance = work cost ÷ call cost.
- Compare with the water in your area and your call log (the cost of turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The work costs $4 in a part and time. A call would cost $50. Every figure is a made-up round number.
| Chance of a low-pressure call in the first months | Expected call cost avoided (chance × $50) | Avoided − $4 |
|---|---|---|
| 4% | $2 | −$2 |
| 8% | $4 | $0 (break-even) |
| 16% | $8 | +$4 |
| 30% | $15 | +$11 |
The work pays at an 8% chance of a call: $4 ÷ $50. In an area with hard water or old pipes, aerators clog often.
Turn on every faucet at turnover and watch the stream. Unscrew the tip, soak the screen in vinegar and rinse, or replace the aerator if it is damaged. Keep a few spares of the common sizes in the van.
Making it routine
- Run every faucet at turnover.
- Clean or replace aerators that dribble.
- Keep spares of the common sizes.
- Note faucets that still run poorly.
Run your own numbers
Use the free BRRRR calculator below to see how small yearly costs per unit add up across a building.