Roof Workmanship Warranty: The Claim Odds That Pay
A roofer may offer a longer workmanship warranty for an extra fee. The warranty pays only if the installation turns out to be defective. The question is how likely that has to be over the warranty period for the extra price to pay.
The steps
- Take the extra price for the longer warranty.
- Estimate the cost of a covered defect.
- Break-even chance (over the period) = extra price ÷ cost of a covered claim.
- Compare with the roofer’s track record (roof repair, overlay or replace).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The extra price is $900 for a 10-year warranty. A covered defect would cost $6,000 to fix. Every figure is a made-up round number.
| Chance of a covered claim over the period | Expected cost avoided (chance × $6,000) | Avoided − $900 |
|---|---|---|
| 5% | $300 | −$600 |
| 15% | $900 | $0 (break-even) |
| 25% | $1,500 | +$600 |
The warranty pays at a 15% chance of a covered claim over ten years: $900 ÷ $6,000. For a good roofer with a clean record, the chance of a defect is lower than that, and the extra fee is a poor bet on arithmetic alone.
There are two other things. First, the warranty has to be honored: a roofer who is out of business in five years is no help. Second, a transferable warranty can be a selling point on a flip or a rental you may sell (a home warranty on a rental).
Making it routine
- Ask how long the roofer has been in business.
- Read what is and is not covered.
- Compute the break-even chance.
- Ask if the warranty is transferable.
Run your own numbers
Use the free holding cost calculator below to see what a roof delay costs each day.