Same Checklist for Every Draw Inspection: The Visits
Each inspector writes their report differently, and what you need is the same every time: what is done, what is open, what is wrong. A standard checklist asks for it in the same order. Building one takes an hour. The question is how many visits it takes to pay back.
The steps
- Price the setup: hours × the value of your time.
- Price the saving per visit: minutes saved × the value of your time.
- Break-even visits = setup cost ÷ saving per visit.
- Keep the same inspector where you can (same inspector for every draw).
A worked example
Example (illustrative arithmetic, not benchmarks)
Setup takes 1 hour at $60: $60. Each visit saves 10 minutes: $10. Every figure is a made-up round number.
| Visits with the checklist | Time saved (visits × $10) | Saved − $60 |
|---|---|---|
| 3 | $30 | −$30 |
| 6 | $60 | $0 (break-even) |
| 12 | $120 | +$60 |
| 24 | $240 | +$180 |
The checklist pays back after 6 visits: $60 ÷ $10. A lender with several rehabs and a visit every two weeks is there in a few weeks.
List each trade with its percent complete, open items from the last visit, safety issues and the photos taken. Give it to every inspector before the first visit. A checklist records what the inspector saw; it does not guarantee the work.
Making it routine
- Build a one-page checklist.
- Give it to each inspector before the first visit.
- Carry open items forward each time.
- Remember it records observations, not guarantees.