Give the Draw Inspector a Written Scope Letter: The Odds

By DeskTech HQ · · 1 min read

An inspector visits and checks the framing when you wanted to know about the plumbing rough-in. A one-page scope letter for each job says what to check, what to photograph and what to report. Writing it takes about twenty minutes. The question is how likely a visit is to check the wrong things for the letter to pay.

The steps

  1. Price the letter: minutes × the value of your time.
  2. Price a wrong-things-checked visit: a repeat visit or a bad approval.
  3. Break-even chance = letter cost ÷ visit cost.
  4. Pair it with a standard checklist (same checklist for every draw inspection).

A worked example

Example (illustrative arithmetic, not predictions)

The letter takes 20 minutes at $60 an hour: $20. A wrong-things-checked visit would cost $400. Every figure is a made-up round number.

Chance a visit checks the wrong things Expected cost avoided (chance × $400) Avoided − $20
2.5% $10 −$10
5% $20 $0 (break-even)
10% $40 +$20
20% $80 +$60

The letter pays at a 5% chance that a visit checks the wrong things: $20 ÷ $400. With new inspectors and complex scopes, it is plausible.

Say what stage the job is at, what to look at, what photos you need and what to report. Attach the scope and the budget lines. Keep it to one page, and send it before the first visit. The inspector’s report is an observation, not a guarantee.

Making it routine

  1. Say the stage of the job and what to check.
  2. List the photos you need.
  3. Attach the scope and budget lines.
  4. Send it before the first visit.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how a repeat visit adds to the cost of a rehab loan.

Quick answers

What is a scope letter?

A one-page note telling the inspector what to check, what to photograph and what to report.

How do I price it?

The minutes to write it times the value of your time.

What does a wrong-things-checked visit cost?

A repeat visit or an approval based on the wrong check.

What is the break-even chance?

The letter's cost divided by that cost.

Do the numbers in this guide apply to my draws?

No. The time, cost and odds are made up for the example. They are not predictions.