Scan the Roof From the Street Before the Showing
You drive across town to a house with a roof that sags and a blue tarp on one slope. You would have passed on the roof alone. A binocular scan of the roof from the street takes five minutes. The question is how likely the roof is to be a deal-breaker for the scan to pay before you go.
The steps
- Price the scan: minutes × the value of your time.
- Price a wasted trip: travel, a showing slot and a possible fee.
- Break-even chance = scan cost ÷ trip cost.
- Price an old roof properly (pricing an old roof).
A worked example
Example (illustrative arithmetic, not predictions)
The scan takes 5 minutes at $60 an hour: $5. A wasted trip costs $100. Every figure is a made-up round number.
| Chance the roof is a deal-breaker | Expected cost avoided (chance × $100) | Avoided − $5 |
|---|---|---|
| 2.5% | $2.50 | −$2.50 |
| 5% | $5 | $0 (break-even) |
| 10% | $10 | +$5 |
| 20% | $20 | +$15 |
The scan pays at a 5% chance that the roof is a deal-breaker: $5 ÷ $100. On older housing stock, it is plausible.
Stand on the public sidewalk, look at the lines, the shingle surface and any patches or tarps, and photograph what you see. A scan from the street is not an inspection.
Making it routine
- Stand on the public sidewalk.
- Look at the lines and shingle surface.
- Photograph patches and tarps.
- Have a roofer assess it properly.
Run your own numbers
Use the free MAO calculator below to see how a roof credit changes the most you can offer.