Smart Thermostat Where the Owner Pays Heat: Payback

By DeskTech HQ · · 1 min read

A thermostat that follows a schedule can keep a vacant or sparsely used unit from heating itself all day. In a rental where the owner pays for heat, the saving is the owner’s. The question is how long it takes to repay the cost.

The steps

  1. Get the installed cost.
  2. Take your yearly heating bill.
  3. Yearly saving = bill × the share saved.
  4. Payback = cost ÷ yearly saving (attic insulation payback).

A worked example

Example (illustrative arithmetic, not measured results)

The thermostat costs $120 installed. The yearly heating bill is $1,500, and the thermostat saves 8%, $120 a year. Every figure is a made-up round number.

Years of savings Savings (years × $120) Savings − $120
0.5 $60 −$60
1 $120 $0 (break-even)
5 $600 +$480

Payback comes in a year: $120 ÷ $120. At a 4% saving, it takes two years; at 2%, four. The saving is the soft number, so test it against your own bills before and after.

Agree in the lease who sets the temperature. A thermostat that the owner locks too low can create a habitability problem and a dispute. And a connected device records when the unit is occupied, so decide what data you collect and who can see it (low-flow toilet payback).

Making it routine

  1. Check who pays for heat in each unit.
  2. Compare bills before and after.
  3. Compute the payback.
  4. Put temperature control and data rules in the lease.

Run your own numbers

Use the free BRRRR calculator below to see how a lower yearly expense changes a rental’s cash flow.

Quick answers

How do I find the payback?

Divide the installed cost by the yearly heating savings.

How much will it save?

It varies with the home and the tenant. Use a cautious share and your own bills.

Who controls it?

Decide in the lease whether the tenant or owner sets it, and respect tenant privacy.

Does the tenant pay the heat?

If so, the saving goes to them. This guide is for owner-paid heat.

Do the numbers in this guide apply to my rental?

No. The cost and savings are made up for the example. They are not measured results.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.