Storm Windows: Payback When the Owner Pays Heat
Storm windows cut drafts and heat loss at a fraction of the price of new windows. In a rental where the owner pays for heat, the saving is the owner’s. The question is how long the saving takes to repay the cost. The honest answer is often a long time.
The steps
- Get the installed cost.
- Take your yearly heating bill and the share saved.
- Yearly saving = bill × share.
- Payback = cost ÷ yearly saving (attic insulation payback).
A worked example
Example (illustrative arithmetic, not measured results)
Eight storm windows cost $1,200 installed. The yearly heating bill is $1,500, and the windows save 6%, $90 a year. Every figure is a made-up round number.
| Years of savings | Savings (years × $90) | Savings − $1,200 |
|---|---|---|
| 5 | $450 | −$750 |
| 13.3 | $1,200 | $0 (break-even) |
| 20 | $1,800 | +$600 |
Payback takes about thirteen years: $1,200 ÷ $90. Compare that with attic insulation, which paid back in nine, or a thermostat, which paid back in one. Storm windows rarely win on heating savings alone.
They may still be worth doing for other reasons: a draft complaint that costs a tenant, a lower noise level, a unit that leases faster. If those are your reasons, price them separately. If the only reason is the heating bill, do the cheaper items first (a smart thermostat).
Making it routine
- Rank upgrades by payback.
- Do the quick paybacks first.
- Put the slow ones on the capex plan.
- Follow lead-safe rules on older homes.