Low-Flow Toilet: Payback When the Owner Pays Water

By DeskTech HQ · · 1 min read

In a rental where the owner pays for water, an old toilet is a leak in the budget. A newer one uses less per flush. The question is how long the saving takes to repay the cost.

The steps

  1. Get the installed cost of the new toilet.
  2. Estimate the gallons saved a year.
  3. Yearly saving = gallons saved × price per gallon from your bill.
  4. Payback = cost ÷ yearly saving (a capex reserve by system age).

A worked example

Example (illustrative arithmetic, not measured savings)

The installed cost is $210. The new toilet saves 12,000 gallons a year at $9 per thousand gallons, $108 a year. Every figure is a made-up round number.

Years the toilet stays in service Savings (years × $108) Savings − $210
1 $108 −$102
1.9 $210 $0 (break-even)
5 $540 +$330

Payback comes in under two years: $210 ÷ $108. A toilet lasts far longer, so the rest is gain. In a rental where the tenant pays the water, the saving goes to them, and the case rests on the toilet’s age and repairs, not the bill.

Your own bill is the test. Look at the water cost per thousand gallons, including sewer charges tied to it, and the number of people in the unit. A single-person apartment saves less than a family home (a water heater at year 10).

Making it routine

  1. Check whether the owner or tenant pays water.
  2. Use the rate on your own bill.
  3. Compute the payback.
  4. Replace the oldest fixtures first.

Run your own numbers

Use the free BRRRR calculator below to see how a lower yearly expense changes a rental’s cash flow.

Quick answers

How do I find the payback?

Divide the installed cost by the yearly water savings.

How do I find the water savings?

Gallons saved a year times the price per gallon on your bill.

Does the tenant pay the water bill?

If so, the owner sees no savings. This guide is for owner-paid water.

Are there rebates?

Some utilities offer them. Ask yours.

Do the numbers in this guide apply to my property?

No. The water use and rate are made up for the example. They are not measured savings.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.