Smell Test for Smoke and Pet Odor Before an Offer

By DeskTech HQ · · 1 min read

A house with years of smoke or pets can smell fine for a day after air fresheners and fresh paint. The smell returns in humid weather and tenants notice. A closed-up smell test takes ten minutes. The question is how likely a hidden odor is for the test to pay.

The steps

  1. Price the test: minutes × the value of your time.
  2. Estimate the cost of removing a hidden odor: sealing, flooring, duct cleaning.
  3. Break-even chance = cost ÷ removal cost.
  4. Pair it with the inspection and the flooring plan (pro carpet cleaning at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The test takes 10 minutes at $60 an hour: $10. Removing a hidden odor would cost $2,500. Every figure is a made-up round number.

Chance of a hidden odor problem Expected cost avoided (chance × $2,500) Avoided − $10
0.2% $5 −$5
0.4% $10 $0 (break-even)
1% $25 +$15
3% $75 +$65

The test pays at a 0.4% chance of a hidden odor: $10 ÷ $2,500. In a long-lived home, that is likely exceeded.

Ask to see the house shut up for a few hours with the air fresheners off, walk in cold and note each room. Check closets, the basement, ducts and the corners of carpeted rooms. If you smell something, make the inspector’s findings and a flooring plan part of your price.

Making it routine

  1. Ask for the house to be closed up first.
  2. Walk in cold and note each room.
  3. Check closets, ducts and carpet corners.
  4. Price any odor into the offer.

Run your own numbers

Use the free MAO calculator below to see how a flooring replacement changes the most you can offer.

Quick answers

Why test for odor?

Smoke and pet odors soak into drywall, subfloors and ducts and are costly to remove.

How do I price the test?

The minutes times the value of your time.

What is the break-even chance?

The cost divided by the cost of removing a hidden odor.

How do I test?

Ask for the house to be closed up for a while, then walk in cold and note smells in each room.

Do the numbers in this guide apply to my deal?

No. The cost, loss and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.