Verifying a Borrower's Flip Track Record Before You Lend
“I’ve done six flips and make about $45,000 each in five months” is a pitch, not a record. The closing documents are the record, and comparing the two takes an hour.
What to collect and check
- A list of every deal the borrower claims, with address and role.
- The settlement statements for each purchase and sale.
- Public records for each address: deed dates, prices, owner names (title commitment).
- The borrower’s rehab cost for each, with a few invoices as a spot check.
- Whether the borrower owned the property alone or with partners (partnership profit splits).
A worked example
Example (illustrative arithmetic, not a benchmark)
The borrower claims six flips, about $45,000 of profit each, held about five months. The documents support five. Selling costs are taken as 8% of the sale price. Every figure is a made-up round number.
| Deal | Purchase + rehab | Sale | Gross profit | Net after 8% | Months |
|---|---|---|---|---|---|
| 1 | $155,000 | $210,000 | $55,000 | $38,200 | 5 |
| 2 | $135,000 | $175,000 | $40,000 | $26,000 | 8 |
| 3 | $200,000 | $245,000 | $45,000 | $25,400 | 9 |
| 4 | $105,000 | $150,000 | $45,000 | $33,000 | 6 |
| 5 | $260,000 | $310,000 | $50,000 | $25,200 | 8 |
| Total / average | $855,000 | $47,000 average | $29,560 average | 7.2 average |
| Item | Claimed | Verified |
|---|---|---|
| Completed deals | 6 | 5 |
| Average profit | $45,000 | $47,000 gross, $29,560 net of selling costs |
| Average months held | 5 | 7.2 |
| Return on cost (net, total) | not stated | 147,800 ÷ 855,000 = 17.3% |
The profit claim looks close only because it is before selling costs. The time claim is off by more than two months, and one deal is unsupported. None of this makes the borrower a bad risk. It does mean the loan should be sized on 7 months and $30,000 of net profit, not on 5 months and $45,000 (downside test).
Using what you find
- Ask about each gap in writing and keep the answers in the file (loan file checklist).
- Score the borrower on verified facts only (scorecard).
- Use the verified timeline in your interest-reserve and extension plans (interest reserves).
- Put the result in the approval memo (approval memo).
Run your own numbers
Use the free fix-and-flip loan sizer below to size a loan on the verified numbers instead of the claimed ones.