Tenant Screening Cost vs the Cost of an Eviction

By DeskTech HQ · · 2 min read

A screening report costs about the same as a nice dinner. An eviction costs about as much as a small rehab. The question is how much of the second the first has to prevent to be worth the money.

The steps

  1. Total the cost of an eviction: legal costs, unpaid rent and repairs (turnover cost).
  2. Total the cost of screening one applicant, including your time, and the number of applicants you screen per lease.
  3. Estimate the chance of an eviction without and with your screening, from your own records.
  4. Multiply the drop in odds by the eviction cost.
  5. Compare the result with the cost of screening.

A worked example

Example (illustrative arithmetic, not statistics)

Rent is $1,800 a month. An eviction costs $1,500 in legal fees, three months of unpaid rent ($5,400) and $1,200 of repairs and cleaning: $8,100. Screening costs $60 an applicant, with four applicants screened per lease: $240. Every figure is a made-up round number.

Chance of an eviction Without screening With screening Odds saved Expected saving
Strong effect 5% 2% 3 points $243
Weak effect 5% 4% 1 point $81
Break-even $240 ÷ $8,100 = 3.0 points $240

Screening must lower the chance of an eviction by about three percentage points to pay for itself on this arithmetic. If it only lowers the chance by one point, it loses about $159 per lease ($240 − $81). That is a small number and a small lease. A bad tenancy can cost more than the eviction itself, through damage, lost months and the owner’s time (rental cash flow stress test).

The arithmetic leaves out the point that matters most: screening done badly, or inconsistently, creates legal exposure that dwarfs these figures. Set objective criteria in writing, apply them to every applicant the same way, and have an attorney check them (property manager cost).

Making it routine

  1. Write screening criteria down before you list the unit.
  2. Apply them the same way to every applicant.
  3. Record outcomes: rent paid, late payments, move-out condition.
  4. Re-run the numbers each year with your own data (expenses to count).

Run your own numbers

Use the free BRRRR calculator below to see how a lost month of rent changes your cash flow.

Quick answers

Why price screening at all?

Because it costs money and time, and the benefit is a lower chance of a loss that is much larger. Pricing both lets you decide how much screening is worth.

What does an eviction cost?

Court and attorney costs, unpaid rent while the case runs, repairs, and the vacancy that follows. The total varies widely by place and case.

Are there rules on screening?

Yes. Fair-housing laws, rules on consumer reports and application fees, and local ordinances limit what you can ask, use and charge. Write your criteria down, apply them to every applicant the same way and talk to a qualified attorney.

Who pays for screening?

Practice and rules vary. Where an applicant fee is allowed, it may cover the report cost; your time is a cost either way.

Do the numbers in this guide apply to my rental?

No. The costs, odds and rent are made up for the example. They are not statistics or advice about any tenant.

Keep reading

BRRRR

Eviction Protection Plan: The Eviction Odds

Learn how to find the chance of an eviction that makes a $240 a year eviction protection plan pay for itself on a rental, with simple arithmetic.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.