Two-Week Look-Ahead in Every Draw Request: The Odds
The draw request says what was done. It does not say what comes next. A two-week look-ahead tells you whether the rehab is on track before the next draw. Reading it takes three minutes. The question is how likely a surprise delay is for the reading to pay.
The steps
- Price the reading: minutes × the value of your time.
- Estimate the cost of a delay you learn of too late.
- Break-even chance = reading cost ÷ delay cost.
- Compare with how often your rehabs ran late (rehab schedule buffer by risk).
A worked example
Example (illustrative arithmetic, not predictions)
The reading takes 3 minutes at $60 an hour: $3. A delay learned of too late would cost $300. Every figure is a made-up round number.
| Chance of a surprise delay | Expected cost avoided (chance × $300) | Avoided − $3 |
|---|---|---|
| 0.5% | $1.50 | −$1.50 |
| 1% | $3.00 | $0 (break-even) |
| 3% | $9.00 | +$6.00 |
| 6% | $18.00 | +$15.00 |
The reading pays at a 1% chance of a surprise delay: $3 ÷ $300. Most rehabs run late at some point, so the chance is well above that.
Ask for a short list: what is planned, who is coming, what materials are due and what could slip. Compare it with the last request. A gap between plan and progress is a reason to call, not a default.
Making it routine
- Ask for a two-week look-ahead with each draw.
- Compare it with the last one.
- Call about gaps between plan and progress.
- Do not treat a delay as a default without checking the documents.
Run your own numbers
Use the free fix-and-flip loan sizer below to see what a month of delay adds to a rehab loan.