Walk Away or Close? Sunk Costs on a Deal in Progress

By DeskTech HQ · · 2 min read

You put a house under contract, paid for an inspection and put down a deposit. Then the repair bids come in higher than you planned. It is tempting to close because of everything you have already spent. That is the wrong reason. The right comparison looks forward only.

The steps

  1. List what you have already spent that you cannot recover whichever way you decide. Set it aside.
  2. Work out your result if you close: the expected profit or loss from here on.
  3. Work out your result if you walk: what you lose, which may include a forfeited deposit.
  4. Compare the two results. Pick the better one.
  5. Check the contract’s deadlines before you decide (earnest money and due diligence).

A worked example

Example (illustrative arithmetic, not advice)

A deposit of $5,000. An inspection that cost $500, already paid. The bids have come in higher, so the expected result of closing, flipping and selling is now a $1,000 loss, counting everything from the closing onward. Every figure is a made-up round number.

Choice Deposit refundable Deposit forfeited
Close and flip −$1,000 −$1,000
Walk away $0 from here ($500 already spent either way) −$5,000
Better choice Walk Close

The $500 inspection is gone in both cases, so it does not enter the comparison. If the deposit is refundable, walking costs nothing more, and closing at a $1,000 loss is worse. If walking forfeits the $5,000 deposit, closing at a $1,000 loss is better, because it loses $4,000 less than walking.

Notice that the answer flips with one fact: whether you can recover the deposit. That is a question about the contract, not the arithmetic. It is also why timing matters. A deadline that passes can turn a refundable deposit into a forfeited one (unpermitted work pricing).

Before you accept a loss on a deal, check whether the price can be renegotiated. A seller who sees the bids may prefer a lower price to losing the sale (profit sensitivity).

Making it routine

  1. Know your deposit and deadline terms the day you sign.
  2. Put the repair bids in before the deadline, not after.
  3. Decide with the forward-looking table, not with what you have spent.
  4. Record walk-away decisions and what they cost or saved.

Run your own numbers

Use the free MAO calculator below to see how higher repair costs change the most you can offer.

Quick answers

What is a sunk cost?

Money already spent that you cannot get back whichever way you decide, such as an inspection fee. It should not change the decision.

Is the deposit a sunk cost?

Only if you cannot get it back. A refundable deposit is not sunk. A deposit that would be forfeited if you walk is a cost of walking.

How should I compare the choices?

Compare what you would end up with if you close against what you would end up with if you walk, counting only money that still depends on the decision.

Who decides whether the deposit is refundable?

The contract, its contingencies and deadlines, and state law. Have a qualified attorney read the contract before you terminate.

Do the numbers in this guide apply to my deal?

No. The deposit, fees and profit are made up for the example. They are not advice about any deal.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.