Unpermitted Work: Pricing the Fix Before You Offer
The listing says three bedrooms, two baths and a finished basement. The county has no permit for the basement. The seller priced it as a finished basement. You will pay for what it takes to make it one, or to take it out.
The steps
- Compare the listing and property records with what you see, and ask what permits are on file (pre-offer walkthrough).
- Get a rough scope for bringing the work into compliance: permit fees, plans or an engineer, corrections and a contingency (permits and inspections).
- Add the holding cost of the extra time (holding costs).
- Price the alternative of removing the work, including the value you lose.
- Subtract the cheaper path from your maximum offer (maximum offer).
A worked example
Example (illustrative arithmetic, not permit fees)
A finished basement without a permit. After-repair value is $280,000 and assumes the basement counts. To legalize it: permit and inspection fees $1,800, an engineer $1,200, corrections $9,000 plus a 20% contingency on the corrections ($1,800), and 1.5 months of extra holding at $1,300 a month ($1,950). To remove it instead: $3,500 of work, and the basement’s $18,000 of value comes out of the ARV. Every figure is a made-up round number.
| Item | Legalize | Remove |
|---|---|---|
| Fees and engineer | $3,000 | |
| Corrections plus contingency | $10,800 | |
| Removal work | $3,500 | |
| Extra holding cost | $1,950 | |
| Value lost | $18,000 | |
| Total cost to you | $15,750 | $21,500 |
Legalizing costs $5,750 less than removing, and either costs far more than nothing: $15,750 is 5.6% of the ARV. The seller’s price assumed none of this, so the cheaper path comes straight off your maximum offer (contingency sizing).
The estimates are rough. A contractor’s scope and the building department’s answer may change them, so keep the contingency generous and write the assumption into the offer (cost overrun decisions).
Making it routine
- Check permit history before you make an offer.
- Add a line for unpermitted work to your deal sheet.
- Ask for the answer in writing from the building department when you can.
- Record the actual cost afterward and compare it with the estimate.
Run your own numbers
Use the free maximum allowable offer calculator below to test your offer with the cost to fix the work deducted.