Money at Risk Before Closing: Deposit and Due Diligence

By DeskTech HQ · · 2 min read

The contract is signed on Monday. By Friday the deposit is in escrow, the inspector has been paid, and the engineer is booked. Whether you can still walk away cheaply depends on dates in a contract you may not have reread.

The steps

  1. Calendar every date in the contract: inspection, financing, title, closing.
  2. List each cost and whether it is refundable.
  3. Money at risk on any day = non-refundable costs so far, plus the deposit once the period that protects it has ended.
  4. Set a go or no-go decision before each expensive step (walkthrough).
  5. Record what you spent on deals you walked from.

A worked example

Example (illustrative arithmetic, not typical amounts)

A $180,000 purchase with a deposit of 1% ($1,800), refundable if you cancel inside a 10-day inspection period. Costs: inspection $450 (day 3), engineer $500 (day 6), title and survey $600 (day 9). Every figure is a made-up round number.

Day Event Non-refundable spent so far Deposit at risk? Money at risk
0 Contract, deposit paid $0 Refundable $0
3 Inspection $450 Refundable $450
6 Engineer’s report $950 Refundable $950
9 Title and survey $1,550 Refundable $1,550
11 Inspection period over $1,550 Forfeitable ($1,800) $3,350

Money at risk more than doubles on the day the period ends, from $1,550 to $3,350, which is the deposit of 1.0% of the price plus $1,550 of fees (1.9% together). Check the cheap, deal-killing items first: a walkthrough and comps cost little, the engineer costs $500 (title commitment for lenders). A go or no-go meeting on day 5, before the engineer, would have saved $500 if the numbers had already failed (offer ladder).

Making it routine

  1. Put the dates in a calendar the day you sign.
  2. Hold the meeting with your numbers: profit rule, break-even and a cautious value (buy box).
  3. Never let a deadline pass without a written decision.
  4. Ask your attorney or agent about extensions before the period ends.

Run your own numbers

Use the free maximum allowable offer calculator below to re-test the deal at each decision point.

Quick answers

What is money at risk before closing?

The deposit that could be forfeited, plus the non-refundable costs of checking the property, such as inspections, engineer reports and title work. It grows as you spend and as contingency periods end.

When is the earnest money refundable?

It depends on your contract: the inspection and other contingencies, and the dates by which you must act. Read the contract and calendar the dates; a lawyer or agent can confirm what applies.

Why set a go or no-go meeting?

Decisions get harder as sunk costs grow. A set decision date before the expensive reports, and another before the contingency ends, makes the choice on numbers and not on momentum.

What should be checked first?

The items most likely to kill the deal and cheapest to check: the title commitment, a walkthrough with the rehab estimate, and a quick check of comps. Spend on the big reports after those pass.

Do the numbers in this guide apply to my deal?

No. The price, deposit and fees are made up for the example. They are not typical amounts, and your contract controls what is refundable.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.