Walk the Unit on a Rainy Day Before Listing
The unit looks perfect on a dry day. The first heavy rain after move-in leaves a puddle under the living room window. A fifteen-minute walk of the unit on a rainy day before listing finds the weak spots. The question is how likely an after-move-in leak is for the walk to pay.
The steps
- Price the walk: minutes × the value of your time.
- Price an after-move-in leak: damage, a repair visit and an unhappy tenant.
- Break-even chance = walk cost ÷ leak cost.
- Check the attic too (check the attic for leak stains at turnover).
A worked example
Example (illustrative arithmetic, not predictions)
The walk takes 15 minutes at $60 an hour: $15. An after-move-in leak costs $500 to repair. Every figure is a made-up round number.
| Chance of an after-move-in leak | Expected cost avoided (chance × $500) | Avoided − $15 |
|---|---|---|
| 1.5% | $7.50 | −$7.50 |
| 3% | $15 | $0 (break-even) |
| 6% | $30 | +$15 |
| 10% | $50 | +$35 |
The walk pays at a 3% chance of an after-move-in leak: $15 ÷ $500. In an older building with many windows, it is plausible.
Walk the unit during or just after a steady rain, look and feel around windows, doors, ceilings and corners, mark damp spots and photograph them. Stay off ladders and roofs, and call a professional to trace them.
Making it routine
- Walk the unit in or just after steady rain.
- Look and feel around windows, doors and ceilings.
- Mark and photograph damp spots.
- Call a professional to trace leaks.
Run your own numbers
Use the free BRRRR calculator below to see how an avoided repair affects your returns on a hold.