Walk the Yard for Soggy Spots Before an Offer: The Odds
A patch of lawn that is greener, wetter or sunken than the rest can point at a leaking line underground. A ten-minute walk around the yard before the inspection tells you where to ask the inspector to look. The question is how likely a hidden line problem is for the walk to pay.
The steps
- Price the walk: minutes × the value of your time.
- Estimate the cost of a hidden line problem found late.
- Break-even chance = walk cost ÷ problem cost.
- Follow up with a scope of the line (sewer scope before you offer).
A worked example
Example (illustrative arithmetic, not predictions)
The walk takes 10 minutes at $60 an hour: $10. A hidden line problem found late would cost $2,500. Every figure is a made-up round number.
| Chance the yard hides a line problem | Expected cost avoided (chance × $2,500) | Avoided − $10 |
|---|---|---|
| 0.2% | $5 | −$5 |
| 0.4% | $10 | $0 (break-even) |
| 1% | $25 | +$15 |
| 3% | $75 | +$65 |
The walk pays at a 0.4% chance of a hidden problem: $10 ÷ $2,500. In an older lot with mature trees, the chance is higher.
Walk the yard after rain or a dry spell and look for soggy or unusually green patches, sunken ground, standing water and cracked pavement near the house. Note where the cleanouts and manholes are. Keep clear of any ground that looks unstable, and point your inspector at what you saw.
Making it routine
- Walk the whole yard after rain or a dry spell.
- Look for soggy, green or sunken patches.
- Note cleanouts and manholes.
- Point the inspector at what you saw.
Run your own numbers
Use the free MAO calculator below to see how a line repair changes the most you can offer.