Washer Drain Pan and Auto-Shutoff: The Leak Odds
A washer hose that fails can flood a floor and the unit below. A drain pan and an automatic shutoff valve cost little. The question is how likely a leak has to be, each year, for them to pay.
The steps
- Total the cost of the pan and the shutoff.
- Estimate the damage a leak would cause.
- Break-even chance per year = cost ÷ damage.
- Compare with the age of the hoses and the unit’s floor level (home warranty and repair odds).
A worked example
Example (illustrative arithmetic, not predictions)
The pan and shutoff cost $55. A leak would cause $3,500 of damage. Every figure is a made-up round number.
| Yearly chance of a leak | Expected damage avoided (chance × $3,500) | Avoided − $55 |
|---|---|---|
| 0.5% | $17.50 | −$37.50 |
| 1.6% | $55.00 | $0 (break-even) |
| 3% | $105.00 | +$50.00 |
| 6% | $210.00 | +$155.00 |
The device pays at a 1.6% yearly chance of a leak: $55 ÷ $3,500. For a unit with an old washer on an upper floor, that is likely exceeded. For a ground-floor unit with a new washer, it is less clear.
The first-year cost is the whole cost; the device then protects every year after, which makes the case stronger. Replace rubber hoses with braided ones at the same time, and check the hoses at each turnover (the cost of turnover).
Making it routine
- Check hoses and the washer’s age at each turnover.
- Install a pan and shutoff on upper floors first.
- Compute the break-even chance.
- Confirm the lease and insurance terms.
Run your own numbers
Use the free BRRRR calculator below to see what a water damage claim does to a rental’s cash flow.