Water Heater at Year 10: Replace Early or Run to Failure?

By DeskTech HQ · · 2 min read

A water heater at year ten still works. Replacing it feels wasteful. Waiting feels free until the day it leaks in a tenant’s closet. The question is which costs less per year: replacing on a schedule or running it until it fails.

The steps

  1. Price a planned replacement, installed.
  2. Estimate the years you would get by running it to failure.
  3. For run-to-failure, add the emergency premium and the expected cost of water damage (chance times cost).
  4. Divide each total by the years it covers to get cost per year.
  5. Compare (rental capex reserve).

A worked example

Example (illustrative arithmetic, not quotes or statistics)

A replacement costs $1,300. Replace at year 10: $130 a year. Run to failure at an average of 13 years: the unit ($1,300), an emergency premium of $400, and the chance of water damage at $3,000 a failure. Every figure is a made-up round number.

Chance a failure causes water damage Expected damage (× $3,000) Total cost of running to failure Cost per year over 13 years
0% $0 $1,700 $131
15% $450 $2,150 $165
30% $900 $2,600 $200
Replace at year 10 $1,300 $130

Replacing at year ten costs $130 a year. Running to failure costs at least as much, and more if failures sometimes cause damage. With a 15% chance of damage, running to failure costs $165 a year, 27% more. The extra three years of life from waiting roughly offset the emergency premium and no more.

The table assumes failure comes at 13 years on average, and that replacement at ten gives the full cost per year of 10. A heater in a closet over finished flooring, in a unit with a tenant who does not report drips, has a higher chance of damage. One in an unfinished basement with a drain pan has a lower one. Use your own record of how long heaters last and what failures have cost, and check the heater’s age against the replacement schedule when you inspect each year (annual rental inspections).

Making it routine

  1. Record the install date of every water heater.
  2. Plan replacement at a set age by location risk.
  3. Add a drain pan or leak sensor where damage would be costly.
  4. Keep failure and damage costs in a log.

Run your own numbers

Use the free BRRRR calculator below to see how a yearly capital cost changes a rental’s cash flow.

Quick answers

Should I replace a water heater before it fails?

Compare the cost per year of each choice. Running to failure costs the unit, an emergency premium and the chance of water damage.

What is the emergency premium?

The extra you pay for a rushed replacement, such as weekend rates or limited choice.

How long do water heaters last?

It varies by model, water and care. This guide uses no standard. Use your own records.

What does failure risk depend on?

The location of the heater, whether it has a drain pan or leak sensor, and the tenant's habit of reporting problems.

Do the numbers in this guide apply to my rental?

No. The prices, lives and damage odds are made up for the example. They are not quotes or statistics.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.