Weekly Draw Day vs On-Demand Draws: Whose Time Is It?
A lender who handles draws one at a time answers every request as it comes. A lender who handles them on Wednesday answers them all at once. The second is easier on the lender’s week. Whether it is cheaper overall depends on what the wait costs the borrower.
The steps
- Count draws a year and the minutes each takes on demand and in a batch.
- Compute the lender’s time saved, and its value.
- Compute the average extra wait for a borrower under a weekly day.
- Multiply by the borrower’s cost per day of delay, and by the share of delay days that actually stall work.
- Compare the two (draw turnaround).
A worked example
Example (illustrative arithmetic, not benchmarks)
150 draws a year. On demand each takes 45 minutes; in a weekly batch each takes 30. The saving is 15 minutes × 150 = 37.5 hours, worth 37.5 × $60 = $2,250. A weekly day adds an average wait of 3.5 days. A delay day costs a borrower $150 when work stalls. Every figure is a made-up round number.
Total delay days across all draws: 150 × 3.5 = 525. If every delay day stalled work, the cost would be 525 × $150 = $78,750.
| Share of delay days that actually stall work | Borrowers’ extra cost (× $78,750) | Lender’s saving | Net across both sides |
|---|---|---|---|
| 2.86% | $2,250 | $2,250 | $0 |
| 10% | $7,875 | $2,250 | −$5,625 |
| 20% | $15,750 | $2,250 | −$13,500 |
| Break-even | $2,250 ÷ $78,750 = 2.86% |
If more than about 3% of the extra waiting days stall a borrower’s work, weekly batching costs more than it saves. Many delays do not stall work: the crew moves to another task. But on a busy project, a draw that arrives a week late can idle a crew, and that cost is much larger than the lender’s saving.
The numbers do not say a lender should never batch. They say the choice moves costs from the lender to the borrower, and that borrowers who feel the cost may go elsewhere. A middle path helps: fund small or simple requests the next day and batch the rest, or use two draw days a week (minimum draw size).
Making it routine
- State the draw schedule in the loan documents.
- Track the days from complete request to funds sent.
- Ask borrowers whether waits stalled work.
- Review the schedule each quarter.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how many draws a holdback creates.