Draw Turnaround: What Slow Funding Costs the Borrower
A contractor finishes a phase on Monday and the borrower submits a draw request. The inspection and funding take five business days. During that time the crew may wait, and the borrower’s loan and carrying costs run every day.
The steps
- Total the borrower’s holding cost per day (holding costs on a flip).
- Count your current turnaround, from complete request to funds sent, and the one you could offer.
- Multiply the days saved by the holding cost per day and by the draws on a typical loan.
- Price what the faster turnaround costs you: priority inspections, review time.
- Compare, and decide what to promise and under what conditions (draw request review).
A worked example
Example (illustrative arithmetic, not benchmarks)
The borrower’s holding cost is $150 a day. Today a draw takes 5 business days to fund; a faster process could do it in 2. A typical loan has 6 draws of $15,000. A faster process costs you $60 more per draw in priority inspection and review time. The loan rate is 11%. Every figure is a made-up round number.
| Item | Per draw | Per loan (6 draws) |
|---|---|---|
| Days saved | 3 | 18 |
| Borrower’s holding cost saved (× $150) | $450 | $2,700 |
| Your extra cost | $60 | $360 |
| Extra interest earned on funds out 3 days sooner ($15,000 × 11% ÷ 365 × 3) | $14 | $81 |
| Your net cost of the faster service | $46 | $279 |
The faster process costs you about $279 per loan and saves the borrower about $2,700. That gap is why borrowers may value turnaround and why a lender can sometimes charge for it, subject to the rules. It also costs the borrower more when work stalls: a crew that leaves for another job can add days that the arithmetic above does not count (draw requests from the borrower’s side).
Be careful what you promise. A turnaround that depends on a complete request and a passed inspection should say so. A promise you cannot keep is worse than a longer one you can (draw inspections).
Making it routine
- Measure your actual turnaround on every draw for a quarter.
- Decide what you can reliably offer.
- Put it in the loan documents with its conditions.
- Review the cost against the number of draws each quarter.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how the holdback and draws are set up on a loan.