Write the Draw Inspection Fee and Who Pays It
A borrower gets a bill for the third draw inspection and says nobody mentioned a fee. A line on the draw schedule with the fee and who pays it takes two minutes to add. The question is how likely a fee-surprise dispute is for the line to pay.
The steps
- Price the line: minutes × the value of your time.
- Price a fee surprise: time sorting out a fee the borrower did not expect.
- Break-even chance = line cost ÷ dispute cost.
- Know the failed-visit fee too (re-inspection fee charged to the contractor).
A worked example
Example (illustrative arithmetic, not predictions)
The line takes 2 minutes at $60 an hour: $2. A fee-surprise dispute costs $50 of time. Every figure is a made-up round number.
| Chance of a fee-surprise dispute | Expected cost avoided (chance × $50) | Avoided − $2 |
|---|---|---|
| 2% | $1 | −$1 |
| 4% | $2 | $0 (break-even) |
| 8% | $4 | +$2 |
| 12% | $6 | +$4 |
The line pays at a 4% chance of a dispute: $2 ÷ $50. Over many draws, it is plausible.
Copy the fee and who pays it from the loan documents, put it on the schedule and tell the borrower at closing.
Making it routine
- Copy the fee and who pays it from the loan documents.
- Put it on the draw schedule.
- Tell the borrower at closing.
- Have a lawyer check fees against state rules.