Write the Draw Request Cutoff on the Draw Schedule
A request arrives Thursday evening and the contractor expects it to be paid Friday. The cycle closed Wednesday. A cutoff day and time written on the draw schedule takes three minutes to add. The question is how likely a late submission is for the line to pay.
The steps
- Price the line: minutes × the value of your time.
- Price a late submission: a draw pushed to the next cycle, with the chasing that follows.
- Break-even chance = line cost ÷ late cost.
- Tell them the bank cutoff too (your bank’s wire cutoff time).
A worked example
Example (illustrative arithmetic, not predictions)
The line takes 3 minutes at $60 an hour: $3. A late submission costs $150 in delay and chasing. Every figure is a made-up round number.
| Chance of a late submission | Expected cost avoided (chance × $150) | Avoided − $3 |
|---|---|---|
| 1% | $1.50 | −$1.50 |
| 2% | $3 | $0 (break-even) |
| 6% | $9 | +$6 |
| 10% | $15 | +$12 |
The line pays at a 2% chance of a late submission: $3 ÷ $150. Over many draws, it is easily exceeded.
Pick a cutoff day and time, write it on the schedule and in the first draw email, and apply it the same way each time.
Making it routine
- Pick a cutoff day and time.
- Write it on the draw schedule.
- Repeat it in the first draw email.
- Apply it the same way each time.