Put the Draw Number and Date in Every Draw Email Subject

By DeskTech HQ · · 1 min read

A contractor says a draw was approved in an email last month, and you search the inbox for twenty minutes. A subject line with the draw number and date takes two minutes to set up as a habit or template. The question is how likely a lost-email hunt is, over a loan, for the habit to pay.

The steps

  1. Price the habit: minutes × the value of your time.
  2. Price a lost-email hunt: minutes searching an inbox for a draw email.
  3. Break-even chance = habit cost ÷ hunt cost.
  4. Use a clear subject for investors too (standard subject line for investor emails).

A worked example

Example (illustrative arithmetic, not predictions)

The habit takes 2 minutes at $60 an hour: $2. A lost-email hunt costs $10 of time. Every figure is a made-up round number.

Chance of a lost-email hunt over a loan Expected cost avoided (chance × $10) Avoided − $2
10% $1 −$1
20% $2 $0 (break-even)
40% $4 +$2
60% $6 +$4

The habit pays at a 20% chance of a lost-email hunt: $2 ÷ $10. Over a loan with several draws, it is plausible.

Use the same subject format for every draw email, with the draw number and date, and save it in a draw folder.

Making it routine

  1. Use the same subject format for every draw email.
  2. Put the draw number and date first.
  3. Save each in a draw folder.
  4. Keep the signed documents there too.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how a draw schedule works for a loan.

Quick answers

What goes in the subject line?

The draw number and the date, such as Draw 3 - May 12.

How do I price it?

The minutes to set the habit or template times the value of your time.

What does a lost-email hunt cost?

Minutes searching an inbox for a particular draw email.

What is the break-even chance?

The habit's cost divided by that cost.

Do the numbers in this guide apply to my draws?

No. The time, costs and odds are made up for the example. They are not predictions.