Ask for a Paint Color List With the Final Draw: The Odds
A wall needs a touch-up months later and nobody knows the color. A handyman guesses, and the patch shows. Asking the contractor for a color list with the final draw takes three minutes. The question is how likely a guess is for the ask to pay.
The steps
- Price the ask: minutes × the value of your time.
- Price a guess: a color match job or a repaint.
- Break-even chance = ask cost ÷ guess cost.
- Pair it with the quart on site (leave a labeled quart of touch-up paint).
A worked example
Example (illustrative arithmetic, not predictions)
The ask takes 3 minutes at $60 an hour: $3. A color guess costs $120 to fix. Every figure is a made-up round number.
| Chance of a color guess later | Expected cost avoided (chance × $120) | Avoided − $3 |
|---|---|---|
| 1% | $1.20 | −$1.80 |
| 2.5% | $3 | $0 (break-even) |
| 5% | $6 | +$3 |
| 10% | $12 | +$9 |
The ask pays at a 2.5% chance of a later color guess: $3 ÷ $120. Over a portfolio of finished rehabs, that is plausible.
Ask for brand, color name or code, sheen and rooms in the closeout packet, and keep it with the loan file. Check one wall against the list when you visit.
Making it routine
- Ask for brand, color, sheen and rooms.
- Include it in the closeout packet.
- Keep it with the loan file.
- Check one wall against the list.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how closeout timing affects interest on a rehab loan.