Get the Start Date in Writing Before the First Draw

By DeskTech HQ · · 1 min read

The first draw is funded and the contractor says “next week” for a month. Interest runs and nothing is built. A short written confirmation of the start date a week before the draw takes three minutes. The question is how likely a no-show start is for the step to pay.

The steps

  1. Price the step: minutes × the value of your time.
  2. Price a no-show start: weeks of interest while nothing happens.
  3. Break-even chance = step cost ÷ no-show cost.
  4. Run a kickoff too (kickoff call before the first draw).

A worked example

Example (illustrative arithmetic, not predictions)

The step takes 3 minutes at $60 an hour: $3. A no-show start costs $300 in extra interest. Every figure is a made-up round number.

Chance of a no-show start Expected cost avoided (chance × $300) Avoided − $3
0.5% $1.50 −$1.50
1% $3 $0 (break-even)
3% $9 +$6
5% $15 +$12

The step pays at a 1% chance of a no-show start: $3 ÷ $300. Across many jobs, it is plausible.

Ask the contractor and the borrower for the start date and crew in writing a week before the first draw, hold the draw if the date is vague and re-check the day before. Keep the reply with the loan file.

Making it routine

  1. Ask for the start date and crew in writing.
  2. Hold the draw if the date is vague.
  3. Re-check the day before.
  4. Keep the reply with the loan file.

Run your own numbers

Use the free fix-and-flip loan sizer below to see what a month of idle interest costs on a rehab loan.

Quick answers

What is confirmed?

The day work begins and who will be there.

How do I price it?

The minutes to ask and file the reply times the value of your time.

What does a no-show start cost?

Weeks of interest while nothing happens.

What is the break-even chance?

The step's cost divided by that cost.

Do the numbers in this guide apply to my draws?

No. The time, costs and odds are made up for the example. They are not predictions.