Get the Start Date in Writing Before the First Draw
The first draw is funded and the contractor says “next week” for a month. Interest runs and nothing is built. A short written confirmation of the start date a week before the draw takes three minutes. The question is how likely a no-show start is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a no-show start: weeks of interest while nothing happens.
- Break-even chance = step cost ÷ no-show cost.
- Run a kickoff too (kickoff call before the first draw).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 3 minutes at $60 an hour: $3. A no-show start costs $300 in extra interest. Every figure is a made-up round number.
| Chance of a no-show start | Expected cost avoided (chance × $300) | Avoided − $3 |
|---|---|---|
| 0.5% | $1.50 | −$1.50 |
| 1% | $3 | $0 (break-even) |
| 3% | $9 | +$6 |
| 5% | $15 | +$12 |
The step pays at a 1% chance of a no-show start: $3 ÷ $300. Across many jobs, it is plausible.
Ask the contractor and the borrower for the start date and crew in writing a week before the first draw, hold the draw if the date is vague and re-check the day before. Keep the reply with the loan file.
Making it routine
- Ask for the start date and crew in writing.
- Hold the draw if the date is vague.
- Re-check the day before.
- Keep the reply with the loan file.