Have Each Lien Waiver Signed and Dated Before the Wire
A draw goes out on a promise that the waiver is coming. A week later the contractor is hard to reach and the waiver is unsigned. Checking that each waiver is signed and dated before the wire takes two minutes. The question is how likely an unsigned waiver is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Price an unsigned waiver: time chasing a signature after the money is gone.
- Break-even chance = check cost ÷ waiver cost.
- Know the basics (lien waivers on lender draws).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 2 minutes at $60 an hour: $2. An unsigned waiver costs $100 to chase. Every figure is a made-up round number.
| Chance of an unsigned waiver | Expected cost avoided (chance × $100) | Avoided − $2 |
|---|---|---|
| 1% | $1 | −$1 |
| 2% | $2 | $0 (break-even) |
| 6% | $6 | +$4 |
| 10% | $10 | +$8 |
The check pays at a 2% chance of an unsigned waiver: $2 ÷ $100. Over many draws, it is easily exceeded.
Check for a signature and date before each wire, hold the wire if either is missing and keep the waiver with the draw record.
Making it routine
- Check each waiver for a signature and a date.
- Hold the wire if either is missing.
- Keep the waiver with the draw record.
- Ask a lawyer which form your state requires.