Write the Inspector's Name and Visit Date on Each Approval
A month after a draw is approved, someone asks who inspected the site and when. The answer is in an email chain. Two items on the approval note take two minutes to add. The question is how likely a who-checked-this question is for the line to pay.
The steps
- Price the line: minutes × the value of your time.
- Price a who-checked-this question: minutes working out who visited and when.
- Break-even chance = line cost ÷ question cost.
- Name the signer too (name the authorized signer for draw requests).
A worked example
Example (illustrative arithmetic, not predictions)
The line takes 2 minutes at $60 an hour: $2. A who-checked-this question costs $50 of time. Every figure is a made-up round number.
| Chance of a who-checked-this question | Expected cost avoided (chance × $50) | Avoided − $2 |
|---|---|---|
| 2% | $1 | −$1 |
| 4% | $2 | $0 (break-even) |
| 8% | $4 | +$2 |
| 12% | $6 | +$4 |
The line pays at a 4% chance of a who-checked-this question: $2 ÷ $50. Over a loan with several draws, it is plausible.
Put the inspector’s name and the visit date on every approval note and keep the report with it.
Making it routine
- Put the inspector’s name on every approval note.
- Add the visit date.
- Keep the report with it.
- Check the name against the report.