Dutch vs Non-Dutch Interest Calculator
Dutch interest is charged on the full loan commitment from day one, including rehab money not yet drawn. Non-Dutch interest is charged only on the amount actually funded. Enter the commitment, rate, term, points and draws over time to estimate the interest under both methods and the difference.
Calculator and results
Estimate only. Not a loan offer or a legal definition of any lender’s product.
Draws
- Funded at closing
- $200,000Charged for 12 months.
- Draw 1
- $25,000Charged for 10 months under non-Dutch interest.
- Draw 2
- $25,000Charged for 7 months under non-Dutch interest.
- Draw 3
- $25,000Charged for 4 months under non-Dutch interest.
- Draw 4
- $25,000Charged for 2 months under non-Dutch interest.
- Total funded
- $300,000
- Commitment never drawn
- $0
Total cost including points
- Points (2.0% of the commitment)
- $6,000
- Dutch interest plus points
- $42,000
- Non-Dutch interest plus points
- $35,750
Estimate only. Not a loan offer or a legal definition of any lender’s product.
For estimates only. Not financial, tax or lending advice.
How is Dutch and non-Dutch interest calculated?
- Dutch interest ($) = total commitment ($) × yearly rate (%) ÷ 100 ÷ 12 × term (months). The undrawn holdback is charged as if it were funded on day one.
- Non-Dutch interest ($) = for the amount funded at closing and each draw: amount ($) × yearly rate (%) ÷ 100 ÷ 12 × months charged, added together.
- Months charged = term (months) − the month the money is funded + 1. Money funded at closing is month 1, so it is charged for the whole term. A draw funded after the last month is charged nothing.
- Difference ($) = Dutch interest − non-Dutch interest: the extra interest on money that was not yet drawn.
- Points ($) = commitment ($) × points (%) ÷ 100, paid once and the same under both methods.
What does a worked example look like?
A $300,000 commitment at 12% for 12 months with 2 points: $200,000 funded at closing, then four $25,000 draws funded in months 3, 6, 9 and 11.
- Dutch interest: $300,000 × 12% ÷ 12 × 12 months = $36,000.
- Non-Dutch interest at closing: $200,000 × 1% a month × 12 months = $24,000.
- Non-Dutch interest on the draws: $25,000 × 1% × 10 months = $2,500, then $1,750 (7 months), $1,000 (4 months) and $500 (2 months), so $5,750.
- Non-Dutch interest in total: $24,000 + $5,750 = $29,750.
- Difference: $36,000 − $29,750 = $6,250 more with Dutch interest. Points are $6,000 either way.
What does this calculator leave out?
- Whole months only. It does not prorate by day or use a 360-day year, which many loan documents do.
- Interest-only and simple, with no compounding, no early payoff, and no default interest or extension fees.
- Up to four draws after closing. Combine smaller draws, or run it twice, for a longer schedule.
- It is not a second total-cost calculator: for points, fees and the monthly interest-only payment on a single amount, use the hard money loan calculator.
- How a lender charges interest is set by its own loan documents, not by this page.
Dutch vs Non-Dutch Interest Calculator questions
What is Dutch interest on a construction loan?
Dutch interest charges interest on the full loan commitment from closing, including the rehab or construction holdback that has not been drawn yet.
What is the difference between Dutch and non-Dutch interest?
Dutch interest is charged on the full commitment. Non-Dutch interest is charged only on the amount funded so far, so it grows as each draw is funded.
How much more does Dutch interest cost?
It depends on how much is held back and how slowly it is drawn. In the worked example, a $300,000 loan at 12% for 12 months costs $6,250 more with Dutch interest.
Do points change between the two methods?
No. In this calculator, points are a percentage of the commitment, paid once, so they are the same under both methods.
Is this a loan offer?
No. Estimate only. Not a loan offer or a legal definition of any lender’s product. The loan documents set how interest is charged.
Keep draws and loan records in one place.
DeskTech Lending tracks draw requests, approvals and status on each loan. It does not initiate wires, send funds, process borrower payments or investor payouts, use ACH or move money. Funds move through your own bank, title company or escrow agent.
Related pages
- Hard money loan calculator (points, fees and interest-only payment)
- Construction draw management software
- Free construction draw schedule template
- DeskTech Lending