For private money lenders
Hard Money Loan Calculator
A hard money loan costs more than its rate. Enter the loan amount, rate, points, fees and term to see the monthly interest-only payment, the points and fees in dollars and the total cost of borrowing.
Calculator and results
This calculator is an estimate, not a loan offer.
Cost breakdown
- Interest (6 months)
- $12,000
- Points (2.0% of the loan)
- $4,000
- Lender fees
- $1,500
- Total cost of borrowing
- $17,500
- Total cost as % of the loan
- 8.8%
This calculator is an estimate, not a loan offer.
For estimates only. Not financial, tax or lending advice.
How it’s calculated
- Monthly interest-only payment ($ per month) = loan amount ($) × yearly interest rate (%) ÷ 100 ÷ 12.
- Total interest ($) = monthly interest-only payment ($) × term (months).
- Points ($) = loan amount ($) × points (%) ÷ 100. One point is 1% of the loan, paid once at closing.
- Lender fees ($) are entered in dollars and paid once.
- Total cost of borrowing ($) = total interest + points + lender fees. It does not include paying back the loan itself.
Worked example
A $200,000 loan at 12% with 2 points, $1,500 in lender fees and a 6-month term:
- Monthly interest-only payment: $200,000 × 12% ÷ 12 = $2,000 a month.
- Interest for the term: $2,000 × 6 months = $12,000.
- Points: $200,000 × 2% = $4,000.
- Lender fees: $1,500.
- Total cost of borrowing: $12,000 + $4,000 + $1,500 = $17,500, about 8.8% of the loan.
Limitations
- Assumes interest-only payments on the full loan for every month. Loans with a rehab holdback that charge interest only on money drawn will cost less.
- Assumes you keep the loan for the whole term. Paying off early saves interest unless the loan has minimum interest or a prepayment penalty.
- Leaves out extension fees, default interest, late fees, draw or inspection fees, title, escrow, insurance and other closing costs unless you add them to lender fees.
- Does not tell you whether you qualify or what rate a lender will offer.
Hard Money Loan Calculator questions
How do you calculate a hard money loan payment?
Most hard money loans are interest-only. Multiply the loan amount by the yearly rate and divide by 12. A $200,000 loan at 12% is $2,000 a month.
What are points on a hard money loan?
Points are an up-front charge as a percentage of the loan. One point is 1% of the loan amount, so 2 points on $200,000 is $4,000, usually paid at closing.
What is the total cost of a hard money loan?
It is the interest over the term plus points plus lender fees. On a $200,000 loan at 12% for 6 months with 2 points and $1,500 in fees, that is $17,500.
Is the total cost the same as the APR?
No. This calculator adds up dollars over the term you enter. It does not calculate an APR or annual yield.
Is this a loan offer?
No. This calculator is an estimate, not a loan offer. Your lender sets the actual rate, points, fees and terms.
Size, send and close loans in one place.
DeskTech Lending turns this kind of sizing into an e-signable term sheet, then runs closing, payments and investor reporting.