After a Storm: Checking Collateral Across Your Loan Book

By DeskTech HQ · · 2 min read

A storm crosses the county. Six of your forty loans are on properties in its path. The borrowers have not called. Whether you find out this week or three months from now can be the difference between an insurance claim filed in time and one that is not.

The steps

  1. List the loans with collateral in the affected area and their balances (concentration).
  2. Contact each borrower the same day, in writing, and ask about damage, the insurer and the policy status.
  3. Inspect or get photos for each property, largest balances first (site visit report).
  4. Confirm each policy is in force and note claim deadlines (insurance requirements).
  5. Record the findings, and add anything unresolved to your watch list (watch list).

A worked example

Example (illustrative arithmetic, not claim statistics)

Six loans in the affected area, averaging $135,000, so $810,000 at risk. A check of each costs $150 for a drive-by inspection and an hour of your time at $60: $210 a loan. Suppose one damaged property has a lapsed policy and $18,000 of repairs that nobody would pay for. Every figure is a made-up round number.

Item Amount
Balances in the affected area (6 × $135,000) $810,000
Cost of checking all six (6 × $210) $1,260
Uninsured damage a check might uncover $18,000
Chance the check must find such a loss to pay for itself ($1,260 ÷ $18,000) 7%

The check pays for itself if there is a 7% chance, or better, that one of the six has uninsured damage of that size that you would otherwise learn about late. With six properties in a storm path, that is not a long shot (insurance lapse).

The arithmetic leaves out the soft benefits: filing before a deadline, stopping further damage, and keeping the borrower’s lender record accurate. It also leaves out the cost of doing nothing and learning about it in a default (protecting collateral).

Making it routine

  1. Keep a loan list by property address that you can sort by zip code or area.
  2. Write a short storm checklist and a borrower message in advance.
  3. Record the result of every check, including “no damage.”
  4. After each event, add what you learned to your policy manual.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the balances and values of the loans in an affected area.

Quick answers

Why check loans after a storm?

Borrowers often do not tell the lender about damage until they are late. Insurance claims have deadlines, and unrepaired damage can get worse, so an early look helps.

Which loans should I check?

Those with collateral in the affected area. Use your loan list by property address, and check them in order of balance.

What do I look for?

Visible damage, whether the borrower has reported it to the insurer, whether the policy is in force and covers the cause, and what repairs are planned. Record it in the loan file.

Who handles insurance money after a loss?

The loan documents say how proceeds are handled; many give the lender a role. Ask an attorney about your documents and the law ([insurance claims](/blog/insurance-claim-proceeds-lender-handling)).

Do the numbers in this guide apply to my loans?

No. The balances, costs and damage are made up for the example. They are not weather data, claim statistics or advice about any property.

Keep reading

Private and hard money lending

Contractor Concentration: Many Loans, One Builder

Learn how to count how many of your loans depend on the same contractor, price the cost of that contractor failing, and set a cap, with a worked example.

· 2 min read
Private and hard money lending

Loan-Level Profit: What Each Loan Really Earned

Learn how to compute each private loan's profit after your time, outside costs and cost of capital, and see how one troubled loan changes the book.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.