Document Prep Fee: Charging What Closing Really Costs

By DeskTech HQ · · 2 min read

A closing looks like one line on the settlement statement. Behind it are an attorney, staff time and a recording fee. If the document fee is set by habit rather than by cost, the gap shows up forty times a year. The question is how big it is.

The steps

  1. List what a closing costs you: the document preparer, your time, recording and other direct costs.
  2. Total them for a typical loan.
  3. Compare with the fee you charge.
  4. Multiply the gap by the loans you close in a year.
  5. Set the fee in a written schedule, and apply it the same way every time (clear fee schedule).

A worked example

Example (illustrative arithmetic, not benchmarks)

An attorney prepares documents for $300. Staff time is 2 hours at $60: $120. Recording costs $40. The cost of a closing is $460. You close 40 loans a year. Every figure is a made-up round number.

Document fee charged Gap per loan (fee − $460) Per year (× 40)
$250 −$210 −$8,400
$460 $0 $0
$600 +$140 +$5,600

A fee set at $250 loses $8,400 a year against real cost. A fee equal to cost recovers it. A fee above cost raises other questions: whether the law allows it, and how it is disclosed. Fees that look like a profit centre can draw attention that fees tied to cost do not (effective yield with points and fees).

Re-run the cost each year. A change in your attorney’s price or in the staff time per closing changes the number. A fee schedule that has not been checked against cost for three years is probably wrong in one direction or the other (third-party servicer or in-house).

Making it routine

  1. Track the cost of each closing.
  2. Compare the average with the fee annually.
  3. Keep the fee schedule in writing.
  4. Have an attorney confirm the fee and its disclosure.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the fees on a loan alongside its interest and points.

Quick answers

What does a document prep fee cover?

The cost of preparing and closing a loan: attorney or document service, staff time, and recording. What a lender may charge, and how, is set by law and the loan documents.

How do I set the fee?

Total what a closing really costs you, then compare it with the fee. A fee far below cost loses money on every loan.

Can I charge more than it costs?

Limits on fees and required disclosure differ by state and loan type. Have a qualified attorney confirm what is allowed.

Should the fee be the same for every borrower?

A written fee schedule applied the same way is easier to defend and to explain. See the guide on a clear fee schedule.

Do the numbers in this guide apply to my loans?

No. The costs, fees and loan count are made up for the example. They are not benchmarks.

Keep reading

Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.