Contractor Warranty Letter With the Final Draw: The Odds
A rehab is finished and paid for. Three months later a new tile cracks or a drain leaks. A one-year workmanship warranty letter, collected with the final draw, gives the owner a claim. Asking takes five minutes. The question is how likely a defect is for the letter to pay.
The steps
- Price the request: minutes × the value of your time.
- Estimate the cost of a defect the owner would otherwise bear.
- Break-even chance = request cost ÷ defect cost.
- Ask for it with the other closeout items (final draw: what to hold back).
A worked example
Example (illustrative arithmetic, not predictions)
The request takes 5 minutes at $60 an hour: $5. A defect the owner would otherwise bear would cost $1,000. Every figure is a made-up round number.
| Chance of a defect the letter helps avoid | Expected cost avoided (chance × $1,000) | Avoided − $5 |
|---|---|---|
| 0.25% | $2.50 | −$2.50 |
| 0.5% | $5.00 | $0 (break-even) |
| 2% | $20.00 | +$15.00 |
| 5% | $50.00 | +$45.00 |
The letter pays at a 0.5% chance of a covered defect: $5 ÷ $1,000. In a full rehab, one in a hundred is ordinary.
Keep the letter short: what is covered, for how long, how to claim and who to call. A warranty is only as good as the contractor, so a letter from a contractor who has gone out of business is worth little. Have an attorney review the form.
Making it routine
- Ask for the letter with the final draw.
- State coverage, period and how to claim.
- Keep it with the closeout file.
- Have an attorney review the form.