Photograph the Utility Meters at the Final Draw: The Odds

By DeskTech HQ · · 1 min read

A rehab finishes, a buyer arrives and a $900 electric bill turns up. Who ran the heaters? Photos of the meters at the final draw fix the readings on the day the work ended. Taking them takes five minutes. The question is how likely a utility dispute is for the photos to pay.

The steps

  1. Price the photos: minutes × the value of your time.
  2. Price a utility dispute: calls, arguments and a possible write-off.
  3. Break-even chance = photo cost ÷ dispute cost.
  4. File them with the closeout (final draw: what to hold back).

A worked example

Example (illustrative arithmetic, not predictions)

The photos take 5 minutes at $60 an hour: $5. A utility dispute would cost $500. Every figure is a made-up round number.

Chance of a utility dispute without the photos Expected cost avoided (chance × $500) Avoided − $5
0.5% $2.50 −$2.50
1% $5.00 $0 (break-even)
3% $15.00 +$10.00
6% $30.00 +$25.00

The photos pay at a 1% chance of a dispute: $5 ÷ $500. With heaters, dehumidifiers and tools running for months, the final bill can be large.

Photograph the electric, gas and water meters with the date visible and note which account each belongs to. Put the photos in the closeout file with the date. Photos fix the readings; the contract and the utility’s rules decide who pays.

Making it routine

  1. Photograph each meter with the date visible.
  2. Note the account for each.
  3. File the photos with the closeout.
  4. Check the contract for who pays utilities.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how closeout costs affect the funds left at the final draw.

Quick answers

Why photograph the meters?

They fix the readings when the rehab ended, before a buyer or tenant arrives.

How do I price it?

The minutes times the value of your time.

What does a utility dispute cost?

Arguments about who owes the final bills.

What is the break-even chance?

The cost divided by the dispute cost.

Do the numbers in this guide apply to my draws?

No. The time, cost and odds are made up for the example. They are not predictions.