Ask for 12 Months of Utility Bills: The Odds

By DeskTech HQ · · 2 min read

A year of water, gas and electric bills shows how a property really behaves. A steady spike can point to a leak or a failing system that the showing missed. Asking costs an email and a few minutes of reading. The question is how likely a hidden problem has to be for the request to pay.

The steps

  1. Price the request: minutes to ask and read × the value of your time.
  2. Estimate the cost of a problem the bills would reveal: a leak, an old system.
  3. Break-even chance = cost ÷ problem cost.
  4. Compare with the age of the building and how it was sold (earnest money at risk).

A worked example

Example (illustrative arithmetic, not predictions)

Asking and reading takes 15 minutes at $60 an hour: $15. A problem the bills would reveal would cost $4,000. Every figure is a made-up round number.

Chance the bills reveal a problem Expected loss avoided (chance × $4,000) Avoided − $15
0.2% $8 −$7
0.375% $15 $0 (break-even)
1% $40 +$25
3% $120 +$105

The request pays at a 0.375% chance of a hidden problem: $15 ÷ $4,000. That is a low bar for an older property.

Compare the months for a pattern rather than a single number. A winter spike in gas is normal. A flat high water bill all year is not. The bills show past use, not future use, and a seller who will not share them has told you something (the 2 percent termite test).

Making it routine

  1. Ask for twelve months of bills in the offer or after it.
  2. Compare month to month.
  3. Compute the break-even chance for the deal.
  4. Ask only with the seller’s consent.

Run your own numbers

Use the free MAO calculator below to see how a repair found before closing changes the most you can offer.

Quick answers

What can utility bills show?

Unusual water use from a leak, or high heating cost from poor insulation.

How do I price the request?

The minutes to ask and read the bills.

What is the break-even chance?

The cost divided by the cost of the hidden problem.

What if the seller says no?

That is information, but it proves nothing. You can ask the utility with the seller's consent.

Do the numbers in this guide apply to my deal?

No. The cost, loss and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.