Lien Waivers and Draws: What a Lender Should Collect

By DeskTech HQ · · 2 min read

A borrower asks for a draw to pay the contractor. The contractor is paid. The contractor then does not pay a subcontractor, and the subcontractor files a claim against the property. Lien waivers are how a lender tries to stop that chain.

What to collect

  1. A waiver from the general contractor with each draw, for the work paid so far.
  2. Waivers from subcontractors and suppliers above a dollar amount set in your policy.
  3. A final waiver from each at the end of the project.
  4. A list of who worked on the property, so missing names stand out (draw checklist).
  5. A title update or lien search before large draws and at the end (title commitment).

A worked example

The loan from the downside test: $165,750 owed in a bad case, 8% selling costs, expected value $240,000 (downside test). A subcontractor was never paid and files a claim. Assume, for the example only, that the claim is paid ahead of the lender; in some states it may not be. Every figure is a made-up round number.

Sale price Net after 8% Cushion, no claim After a $9,000 claim After a $12,000 claim
$216,000 (−10%) $198,720 $32,970 $23,970 $20,970
$192,000 (−20%) $176,640 $10,890 $1,890 −$1,110
$168,000 (−30%) $154,560 −$11,190 −$20,190 −$23,190

At the −20% price, a $9,000 claim removes most of the cushion and a $12,000 claim turns it into a loss. A waiver is cheap by comparison: it costs the contractor a signature, and costs the lender a minute of checking.

Making it routine

  1. Put the waiver rule in the policy and the loan agreement (policy manual).
  2. Release a draw only when the waivers match the work and the people (draw schedule).
  3. Keep the waivers in the loan file (loan file checklist).
  4. Use state-specific forms from an attorney or title company.

Run your own numbers

Use the free fix-and-flip loan sizer below to size the loan before you plan the draws.

Quick answers

What is a lien waiver?

It is a signed statement from a contractor, subcontractor or supplier that they have been paid for work or materials up to a stated point and give up the right to claim a lien for that amount. Forms and rules vary by state.

Why does it matter to a lender?

An unpaid contractor may be able to file a claim against the property. Depending on the state, that claim can compete with or rank ahead of the lender's mortgage, which can shrink what the lender recovers.

When should a lender collect waivers?

Many lenders collect them with each draw request, covering the work being paid for, and a final waiver at project end. The lender's policy should say which.

Does a waiver prove everyone was paid?

No. It covers only the signer and the amount stated. Lenders also check who worked on the property and compare it with who signed. A title company can help with lien searches.

Do the numbers in this guide apply to my loans?

No. The loan, values and claims are made up for the example. They are not legal advice or a prediction of how lien priority works in any state.

Keep reading

Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.